How we get the rates

This page tells you how we get the rates and how the calculator gets the total.

Where the rates come from

Each rate comes from an official document of the utility or of the state commission: a tariff sheet, a rate page or a rate notice. The state commission approves the tariffs of investor-owned utilities. The board or the city council of a public utility or a cooperative approves its tariffs. We do not use rates from other websites.

For each rate, we record these items:

  • The name and the number of the tariff schedule.
  • The date when the rate starts.
  • A link to the tariff sheet.
  • The date of our last check.

How we check a tariff

  1. We open the tariff sheet on the website of the utility.
  2. We read each charge, each tier and each season from the text of the sheet.
  3. We read the rider schedules that the tariff names, for example fuel cost recovery.
  4. We calculate test bills. When an official value exists, we compare the test bills with it: the bill calculator of the state commission, a typical bill that the utility publishes, or the totals on the tariff sheets.
  5. When no official value exists, we calculate the test bills by hand from the tariff, in a separate calculation.
  6. Each utility page tells you which check we used and the result of the check.

We check each tariff again each month. When a rate changes, we update the calculator and the date of our last check.

How the calculator gets the total

  1. It adds the fixed charge. Some utilities use a charge for each day. Some utilities use a charge for each month.
  2. It finds the season from the billing month.
  3. It applies the energy rate of each tier to the kWh in that tier.
  4. It adds the riders. A rider can be a rate for each kWh or a percentage of the bill.
  5. It adds the fees, for example a franchise fee.

The calculator rounds each line to the cent. Each percentage uses the rounded lines. The calculator adds a tax only when you type the tax rate from your bill.

Differences from a bill

Your bill can be different from the result. These are the usual causes:

  • Your bill includes sales tax, a city fee or a discount that you did not type or select.
  • Your billing period has a different number of days.
  • Your billing period starts in one season and stops in a different season.
  • A rate changed during your billing period.
  • The utility rounds a line in a different way. This can cause a difference of one cent.

For example, the Georgia Power tariff (Schedule R-31) gives one winter rate for all kWh. The calculator of the Georgia Public Service Commission divides the winter kWh into three parts and rounds each part. For some kWh values, the two totals are different by one cent. Our calculator follows the text of the tariff.

Utilities that we checked

UtilityScheduleEffectiveLast checked
AEP Ohio (Ohio Power)RSCycle 1 October 2026 (riders); base rates April 10, 2026; Standard Service Offer June 1, 2026October 16, 2026
AES OhioRSBase rates January 1, 2026; standard offer rate and transmission June 1, 2026; riders as of October 1, 2026October 16, 2026
Alabama PowerFDkWh charges for January 2025 billings (2026 bill calculation factors)October 15, 2026
Alliant Energy (Interstate Power and Light)400October 1, 2024, with adjustment factors as of the November 2026 billing monthNovember 2, 2026
Alliant Energy (Wisconsin Power and Light)Rg-1January 1, 2026, with the fuel adjustment of October 1, 2026October 16, 2026
Ameren IllinoisDS-12026 billing periods (delivery); supply October 2026 to May 2027October 16, 2026
Ameren Missouri1(M) EMSJune 1, 2026 (riders as of October 1, 2026)October 15, 2026
Appalachian Power (Virginia)R.S.January 1, 2025 (base rates); riders as in the tariff book update of September 24, 2026October 16, 2026
APS (Arizona Public Service)R-1March 8, 2024 (adjustors as of June 1, 2026)October 16, 2026
APS (Arizona Public Service)R-3March 8, 2024 (adjustors as of June 1, 2026)October 17, 2026
APS (Arizona Public Service)R-EVMarch 8, 2024 (adjustors as of June 1, 2026)October 17, 2026
APS (Arizona Public Service)TOU-EMarch 8, 2024 (adjustors as of June 1, 2026)October 15, 2026
Atlantic City ElectricRSOctober 1, 2026 (tariff update); BGS energy charges from September 1, 2026 sheetNovember 2, 2026
Austin EnergyResidential ServiceOctober 1, 2026 (bills rendered on or after October 1, 2026; City of Austin Fiscal Year 2027 Electric Tariff)October 16, 2026
Avista Utilities1January 1, 2026 (riders as of October 1, 2026)November 2, 2026
BGERDelivery rates for 2026; Standard Offer Service and adjustments for the October 2026 billing monthNovember 2, 2026
Black Hills Energy (Cheyenne Light)RJanuary 1, 2026 (adjustments as of July 1, 2026)October 20, 2026
CenterPoint Energy Houston ElectricResidentialFebruary 26, 2026 (base rates); riders as of September 30, 2026October 16, 2026
Central Hudson Gas & ElectricSC 1Rate Year 2 delivery rates July 1, 2026; monthly supply and miscellaneous charges for July to October 2026November 2, 2026
Central Maine PowerAJuly 1, 2026 (delivery); Standard Offer January 1 to December 31, 2026October 16, 2026
Clark Public UtilitiesResidentialMarch 1, 2024. The Board of Commissioners approved the rates on January 23, 2024. The electric rates did not change in 2025 or 2026.October 16, 2026
Colorado Springs UtilitiesETRJanuary 1, 2026 (2026 base rates); Electric Cost Adjustment from October 1, 2026October 16, 2026
ComEdRate BES / Rate RDSDelivery charges for 2026 (Rate MRPP); supply and adjustments for the June to October 2026 billing periodsOctober 16, 2026
Con EdisonSC 1 Rate IFebruary 1, 2026 (delivery rates); adjustment statements as of November 2026November 2, 2026
Connexus EnergyResidentialJanuary 1, 2026 (base rates, Residential Page No. 1); power cost adjustment for each billing month from January to October 2026November 2, 2026
Consumers EnergyRPMService on and after May 1, 2026 (surcharges as of October 2026; PSCR factor of October and November 2026)November 2, 2026
Consumers EnergyRSPService on and after May 1, 2026 (surcharges as of October 2026; PSCR factor of October and November 2026)November 2, 2026
CORE Electric CooperativeAJanuary 1, 2026 (Part III: Electric Rate Schedules); wholesale power cost adjustment for each quarter from the CORE WPCA pageNovember 2, 2026
CoServ Electric202.1April 1, 2026 (Tariff for Electric Service); PCRF and SCRF for the September and October 2026 billing monthsNovember 2, 2026
CPS EnergyREFebruary 1, 2024 (base rates); fuel and regulatory adjustment factors for the January to November 2026 billing monthsNovember 2, 2026
Delmarva PowerRDistribution rates of Rate Year 3 (from January 1, 2025); Standard Offer Service and adjustments for the July to October 2026 billing monthsNovember 2, 2026
Dominion Energy South Carolina8Bills from the first billing cycle of July 2026 (Order No. 2026-374)October 15, 2026
Dominion Energy Virginia1Usage on and after July 1, 2026 (riders as listed in the Exhibit of Applicable Riders, effective September 1, 2026)October 15, 2026
DTE EnergyD1.11Service on and after March 5, 2026 (surcharges as of April 1, 2026; PSCR factor of October 2026)November 2, 2026
DTE EnergyD1.2Service on and after March 5, 2026 (surcharges as of April 1, 2026; PSCR factor of October 2026)November 2, 2026
Duke Energy CarolinasRSService on and after January 1, 2026 (riders as of September 1, 2026)October 15, 2026
Duke Energy FloridaRS-1September 1, 2026 (cost recovery factors as of October 2026)October 15, 2026
Duke Energy IndianaRSJune 17, 2026 (trackers as of bills rendered October 2026)October 15, 2026
Duke Energy ProgressRESService on and after October 1, 2025 (riders as of July 2026)October 15, 2026
Duquesne LightRSDecember 20, 2024 (base rates); riders as of October 1, 2026; default service supply June 1 to November 30, 2026October 16, 2026
El Paso Electric01July 1, 2025 (relate-back date); corrected rates billed from August 2026; riders as of October 2026October 16, 2026
Entergy LouisianaRSAugust 30, 2024 (riders as of October 2026)October 15, 2026
Entergy MississippiRSJuly 1, 2024 (riders for the July 2026 to January 2027 billing months)October 17, 2026
Entergy New OrleansRES-25July 31, 2019, implemented April 2020 billing (riders for the September and October 2026 billing months)October 17, 2026
EPBRSOctober 2024 (base charges); TVA fuel cost adjustment for the August to October 2026 billing monthsNovember 2, 2026
Evergy Missouri MetroRPKAJune 20, 2025 (base rates from January 2023); riders for the July to December 2026 billing monthsOctober 16, 2026
Evergy Missouri WestRPKAJanuary 1, 2025 (base rates); riders for the July to December 2026 billing monthsOctober 16, 2026
Eversource (Connecticut)Rate 1May 1, 2026 (delivery); Standard Service January 1 to December 31, 2026October 16, 2026
Eversource (Massachusetts)R-1September 1, 2026 (delivery); Basic Service August 1, 2026 to January 31, 2027October 16, 2026
Eversource (New Hampshire)ROctober 1, 2026 (delivery); Default Energy Service August 1, 2026 to January 31, 2027October 16, 2026
Florida Power & LightRS-1January 1, 2026 (cost recovery and transition rates as of October 2026)October 15, 2026
Georgia PowerR-31Bills rendered for the June 2026 billing monthOctober 15, 2026
Georgia PowerTOU-OA-15Bills rendered for the June 2026 billing monthOctober 16, 2026
Green Mountain Power1Bills rendered on or after October 1, 2026October 16, 2026
Huntsville UtilitiesRSOctober 1, 2026 (customer charge, energy charge and TVA fuel cost adjustment on the Huntsville Utilities Residential Rates page)November 2, 2026
Idaho Power1January 1, 2026 (PCA and FCA as of June 1, 2026)October 16, 2026
Indiana Michigan Power (Indiana)R.S.May 28, 2024 (base rates); riders as in the tariff book file of October 28, 2026 (fuel cost adjustment and solar power rider from the November 2026 billing month)November 2, 2026
Indiana Michigan Power (Michigan)RSJuly 15, 2024 (base rates); surcharges as in the rate book file of September 18, 2026November 2, 2026
JCP&LRSOctober 1, 2026 (tariff book); BGS energy charges June 1, 2026 to May 31, 2027October 16, 2026
JEARSOctober 1, 2026 (base rates); fuel charge for the October 2026 billing monthOctober 16, 2026
Knoxville Utilities Board (KUB)RSApril 1, 2026 (Resolution No. 1493); rates include the purchased power adjustment that is effective September 1, 2026November 2, 2026
LADWPR-1ABase rates July 1, 2019; adjustment factors for each quarter of 2026October 16, 2026
LCEC (Lee County Electric Cooperative)RSJanuary 1, 2024 (base rates, Sheets No. 8.000 and 8.100); power cost adjustment for each billing month from January to November 2026November 2, 2026
LESRS (01, 03)Services provided after December 31, 2025 (LES Administrative Board Resolution 2025-10, City Council Resolution A-95459). The City Dividend for Utility Ownership of $3.14 is effective with services provided after August 31, 2026.October 17, 2026
LG&ERSBase rates with service rendered on and after September 1, 2026; adjustment factors for the October 2026 billing monthOctober 16, 2026
Liberty (Empire District Electric)TC-RGAugust 3, 2026 (base rates, first year of the phase-in); riders for the June to November 2026 billing monthsOctober 17, 2026
Madison Gas and ElectricRg-1January 1, 2026October 17, 2026
Matanuska Electric Association (MEA)ResidentialOctober 1, 2026 (fourth quarter 2026 schedule of rates)October 20, 2026
Met-EdRSJanuary 1, 2025 (base rates); riders as of October 1, 2026; price to compare June 1 to November 30, 2026October 15, 2026
MidAmerican EnergyRSMay 1, 2018, with adjustment clauses as of August 28, 2026November 2, 2026
Middle Tennessee Electric (MTE)RSOctober 2026 (MTE Rate Schedule); the September 2026 rates are also in the same fileNovember 2, 2026
Mississippi PowerR-62June 18, 2026 (adjustment factors for the September 2026 to January 2027 billing months)November 2, 2026
MLGWRSMeters read on or after January 5, 2026 (base charges); TVA fuel cost adjustment for the January to October 2026 billing monthsNovember 2, 2026
Mon Power and Potomac Edison (West Virginia)ABase rates for service on and after August 1, 2026; environmental control charges July 15, 2026; vegetation management surcharge April 5, 2026October 16, 2026
Montana-Dakota Utilities (North Dakota)10Service rendered on and after September 1, 2026 (interim rates, Case No. PU-26-241), with riders as of October 2026October 20, 2026
Nashville Electric ServiceRSOctober 2024 (base charges); TVA fuel cost for the January to September 2026 billing monthsNovember 2, 2026
National Grid (Massachusetts)R-1October 1, 2026 (delivery); Basic Service August 1, 2026 to January 31, 2027October 16, 2026
National Grid (Upstate NY)SC-1April 1, 2026 (delivery rates); statements as of November 2026November 2, 2026
NorthWestern EnergyREDS-1October 15, 2026 (REDS-1, ESS-1 and WMBA-1); CTC-QF-1 July 1, 2026October 16, 2026
NOVEC (Northern Virginia Electric Cooperative)R-1January 1, 2024 (Schedule R-1); Power Cost Adjustment $0.01320 per kWh from January 1, 2026October 17, 2026
NV Energy (Nevada Power)RSOctober 1, 2026 (Advice No. 26-03)October 15, 2026
NV Energy (Sierra Pacific Power)D-1October 1, 2026 (Notice No. 26-03(E))November 2, 2026
Ohio EdisonRSBase rates March 1, 2026; standard service offer June 1, 2026; riders as of October 1, 2026October 16, 2026
OncorResidentialJune 1, 2026 (base rates); riders as of October 4, 2026October 16, 2026
OPPD110January 1, 2026 (Resolution No. 6743). The FPPA factor of 0.521 cents per kWh is also effective January 1, 2026.October 16, 2026
Pacific Power (Oregon)4Service on and after January 1, 2025 (Advice No. 24-024/Docket No. UE 433), with adjustments as of May 1, 2026November 2, 2026
PECORTariff Supplement No. 37 (October 1, 2026); supply price June 1 to November 30, 2026October 16, 2026
Pedernales Electric Cooperative (PEC)500.2.1October 1, 2026 (Tariff and Business Rules for Electric Service); Flat Base Power Charge $0.065900 per kWh from March 1, 2026; TCOS Pass Through Charge $0.020688 per kWhOctober 16, 2026
PenelecRSJanuary 1, 2025 (base rates); riders as of October 1, 2026; price to compare June 1 to November 30, 2026October 15, 2026
Penn PowerRSJanuary 1, 2025 (base rates); riders as of October 1, 2026; price to compare June 1 to November 30, 2026October 15, 2026
PepcoRDistribution rates of August 28 to October 31, 2026; Standard Offer Service and adjustments for the October 2026 billing monthNovember 2, 2026
PG&EE-1June 1, 2026October 16, 2026
PG&EE-ELECJune 1, 2026October 16, 2026
PG&EE-TOU-CJune 1, 2026October 16, 2026
PG&EE-TOU-DJune 1, 2026October 16, 2026
PG&EEV2-AJune 1, 2026October 16, 2026
Portland General Electric7Service on and after July 8, 2026 (Advice No. 26-24), with adjustments as of October 1, 2026October 15, 2026
Potomac EdisonRSchedule R of June 1, 2026; Standard Offer Service and adjustments for the July to October 2026 billing monthsOctober 16, 2026
PPL Electric UtilitiesRSOctober 1, 2026 (distribution); default service prices July 1 to November 30, 2026October 15, 2026
PSE&GRSOctober 1, 2026 (tariff); BGS energy charges from June 1, 2026November 2, 2026
PSEG Long Island (LIPA)SC 1, Rate 194January 1, 2026 (delivery rates); power supply charge of each 2026 month; statements as of October 2026November 2, 2026
Puget Sound Energy7January 29, 2026 (riders as of October 1, 2026)October 15, 2026
Rappahannock Electric Cooperative (REC)A-1Bills issued on and after October 1, 2024 (Schedule A-1, Case No. PUR-2024-00132); Power Cost Adjustment $0.03426 per kWh from May 1, 2026; DR Rider $0.000031 per kWh from January 1, 2026October 17, 2026
Rhode Island EnergyA-16October 1, 2026 (delivery summary and Last Resort Service); Rate A-16 September 1, 2026October 16, 2026
Rocky Mountain Power1August 10, 2026 (adjustments as of September 25, 2026)October 15, 2026
Rocky Mountain Power2November 17, 2025 (adjustments as of July 1, 2026)October 20, 2026
SDG&EDRSeptember 30, 2026 (sheets); bundled rates from August 1, 2026November 2, 2026
SDG&EEV-TOU-2September 30, 2026 (sheets); bundled rates from August 1, 2026November 2, 2026
SDG&EEV-TOU-5September 30, 2026 (sheets); bundled rates from August 1, 2026November 2, 2026
SDG&ETOU-DR1September 30, 2026 (sheets); bundled rates from August 1, 2026November 2, 2026
SDG&ETOU-DR2September 30, 2026 (sheets); bundled rates from August 1, 2026November 2, 2026
SDG&ETOU-ELECSeptember 30, 2026 (sheets); bundled rates from August 1, 2026November 2, 2026
Seattle City LightRSCJanuary 1, 2026 (Ordinance 127122). The 4% RSA surcharge stopped on April 1, 2026.October 16, 2026
SMUDR-TODJanuary 1, 2026 (rates); sheets effective June 20, 2025October 16, 2026
Snohomish County PUD7April 1, 2026 (Res. No. 6260). The base charges are effective April 1, 2025. The energy charge is effective April 1, 2026.October 16, 2026
Southern California EdisonDOctober 1, 2026October 16, 2026
Southern California EdisonTOU-D-4-9PMOctober 1, 2026October 16, 2026
Southern California EdisonTOU-D-5-8PMOctober 1, 2026October 16, 2026
SRP (Salt River Project)E-23November 2025 billing cycle (TCA from January 2026; temporary fuel price decrease May to October 2026)October 16, 2026
SWEPCORSJanuary 31, 2023 (riders for the August to October 2026 billing months)October 16, 2026
Tacoma PowerA-1April 1, 2026 (Ordinance No. 28993). The energy charge did not change. The delivery charge and the customer charge changed on April 1, 2026.October 17, 2026
Tampa ElectricRSJanuary 1, 2026 (storm surcharge ended August 1, 2026)October 15, 2026
The Illuminating Company (Cleveland Electric)RSBase rates March 1, 2026; standard service offer June 1, 2026; riders as of October 1, 2026October 16, 2026
Toledo EdisonRSBase rates March 1, 2026; standard service offer June 1, 2026; riders as of October 1, 2026October 16, 2026
United Illuminating (UI)Rate RSeptember 1, 2026 (Rate R, C.P.U.C.A. No. 2525); Standard Service July 1 to December 31, 2026October 16, 2026
Versant PowerAJuly 1, 2026 (delivery); Standard Offer January 1 to December 31, 2026October 17, 2026
We EnergiesRg 1Service on and after January 1, 2026October 15, 2026
West Penn PowerRSJanuary 1, 2025 (base rates); riders as of October 1, 2026; price to compare June 1 to November 30, 2026October 15, 2026
Wisconsin Public ServiceRg-1Service on and after January 1, 2026October 16, 2026
Xcel Energy (Colorado)RE-TOURates and adjustments as of October 19, 2026 (time periods from November 1, 2025)November 2, 2026
Xcel Energy (Minnesota)A01June 1, 2025, with the interim rate surcharge from January 1, 2025 and riders as of October 2026November 2, 2026
Xcel Energy (South Dakota)E01July 1, 2026 (final rates of the 2025 rate case), with riders as of October 2026November 2, 2026
Xcel Energy (Texas)ResidentialBase rates approved January 23, 2024 (Docket No. 54634); riders as of October 2026November 2, 2026
Xcel Energy (Wisconsin)Rg-1Service on and after January 1, 2026October 16, 2026

How we check the other data

  • Government data. Average bills, business rates, natural gas prices, city populations, solar output and Texas plans come from the files of the U.S. Energy Information Administration, the Census Bureau, the National Laboratory of the Rockies (PVWatts) and the Public Utility Commission of Texas. Each page names its source and the year or date of the data.
  • Separate checks. For each data set, a separate test reads the original file again and compares the values with the pages, for example the average bill, the business price, the gas cost or the lowest Texas plan.
  • Programs and rebates. Bill help programs and rebate pages come from the official pages of the state, the utility or the program. Each page shows the date that we checked it.
  • No paid placement. No utility, supplier or program pays us to show a rate, a plan, a ranking or a result. This website has no affiliate links.

Corrections policy

We want every rate and every result to be correct. If you find an error, send an email to contactus@utilityratecalc.com. Give the name of your utility, your rate schedule, the page and the value that is different. If you can, add a link to the official document or a photo of the bill line.

  1. We compare your report with the official document of the utility or the state commission.
  2. If our value is wrong or old, we correct it, run the tests again and update the page. The page then shows the new date of our last check.
  3. If a rate changed, the change is also listed on the rate changes page, with the old and the new value and the source.
  4. If our value is correct, we reply with the official document that shows it.

A difference that comes from your account, for example a tax, a late fee, a past balance or a program discount, is not an error in the tariff: ask your utility about it.