Oncor electric rates and bill calculator

The Oncor delivery charges for 1,000 kWh on the Residential rate are $72.74 in November 2026 (7.3¢ per kWh, before tax). Your retail plan adds its energy charge. This calculator uses the Oncor Residential Service (delivery) tariff and its riders. Type the kWh from your bill. The result shows each charge on a different line.

  • Residential
  • Effective: June 1, 2026 (base rates); riders as of October 4, 2026
  • Last checked: October 16, 2026

Oncor bill calculator

Find the name of your rate schedule on your bill.

Use the meter read dates from your bill (optional)

The calculation runs in your browser. Your kWh and amounts are not sent to us; they are saved only if you click Save this bill, and then only in this browser. Privacy

NOTE

The result is an estimate. Your bill can show other charges, for example sales tax. Compare the result with your bill.

Current Oncor electricity rates

The Oncor delivery charges for 1,000 kWh on Residential, with all delivery charges, at the rates in effect at our last check on October 16, 2026:

Oncor average price per kWh at 1,000 kWh
Billing monthDelivery chargesAverage price per kWh
November$72.747.27¢
Base rates now
ChargeRate
Customer charge$1.48 per month
Metering charge$2.58 per month
Distribution system charge3.6043¢ per kWh

Compare retail plans: 174 electricity plans in the Oncor area, with these delivery charges included in each price.

Add the price of your retail electricity plan to these delivery charges. The average price includes the base rates and the riders. See all rates and riders, the example bills and the sources.

Help paying your Oncor bill

Oncor rate increases

Rate cases of Oncor that are pending or were decided since 2025, from the official documents. The calculator above uses the rates in effect now; a pending request is not in it.

See all pending electric rate increases.

Oncor rebates

Oncor rebates and energy-saving programs: the page lists HVAC, weatherization, income-qualified, solar, smart thermostats, appliances. See also the home energy rebates in Texas. Checked October 22, 2026.

Oncor outages, payments and customer service

Official links and phone numbers from the Oncor website, checked October 20, 2026. This site is not part of Oncor: for an outage or a question about your account, use these links.

If you see a downed power line, stay away from it and call Oncor at 888-313-4747 or 911.

Terms on this tariff: Customer charge, Distribution charge, Distribution cost recovery factor (DCRF), Energy efficiency charge, Interim rate, Interim surcharge, Meter charge, Mobile generation rider, Rate case expense surcharge, Rider, Transmission cost recovery factor (TCRF). See the electric bill glossary.

SOLAR AND EV

Do you want solar panels or an electric vehicle? The Texas solar calculator and the EV charging from solar calculator on ProSolarCalc estimate the savings and the payback. Also read what changed in the federal solar tax credit in 2026. Sri Murugan Systems also makes ProSolarCalc.

Do you have your hourly usage file? Compare Oncor plans and supplier offers with your Green Button data.

Why is my Oncor bill so high? Check your bill against Oncor Residential. How does Oncor compare? See the monthly bill comparison.

What does an appliance cost to run on this tariff? Use the appliance cost tool with Oncor Residential.

The rates in this calculator

These values come from the official tariff documents of Oncor. The Public Utility Commission of Texas approves these tariffs.

Base rates: Residential
ChargeRate
Customer charge$1.48 per month
Metering charge$2.58 per month
Distribution system charge3.6043¢ per kWh
Riders and fees that the calculator adds
ItemRateApplies toSchedule
Transmission cost recovery factor (TCRF) 2.1669¢ per kWh All kWh Rider TCRF (Sheet 6.1, Revision Fifty-three)
Distribution cost recovery factor (DCRF) 0.5755¢ per kWh All kWh Rider DCRF (Sheet 6.4, Revision Twelve)
Energy efficiency cost recovery factor (EECRF) 0.1487¢ per kWh All kWh Rider EECRF (Sheet 6.3, Revision Twenty)
Rate case expense surcharge (RCE) 0.0086¢ per kWh All kWh Rider RCE (Sheet 6.5, Revision Six)
Interim surcharge (Rider IS)
Applies through December 2026.
0.3633¢ per kWh All kWh Rider IS (Sheet 6.7, Revision One)
Mobile generation rider (December only)
Billed in December only.
December: 0.1027¢ per kWh
Other months: none
All kWh Rider MG (Sheet 6.6, Revision Two)

Minimum monthly bill: No minimum is printed. The customer and metering charges ($4.06) apply each month.

A bill that crosses a season or rate change: We did not find in the documents that we read how the utility bills a period that crosses a season or rate change. The calculator uses the rates of the billing month (the month of the end date).

Example delivery charges for 1,000 kWh

Your retail electric provider adds the energy charge of your plan. The examples show the Oncor delivery charges only. These examples use 1,000 kWh. Each column uses the rates of the billing month in its heading. The examples do not include taxes.

LineAll year (November)
Customer charge$1.48
Metering charge$2.58
Distribution system charge$36.04
Transmission cost recovery factor (TCRF)$21.67
Distribution cost recovery factor (DCRF)$5.76
Energy efficiency cost recovery factor (EECRF)$1.49
Rate case expense surcharge (RCE)$0.09
Interim surcharge (Rider IS)$3.63
Mobile generation rider (December only)$0.00
Delivery charges total$72.74

How the calculator gets the total

  1. It adds the customer charge. This is a fixed amount for each month.
  2. It adds the metering charge. This is a fixed amount for each month.
  3. It multiplies the kWh by the rate of the distribution system charge.
  4. It multiplies the kWh by the rate of each of the 5 riders in the riders table, from the transmission cost recovery factor (TCRF) to the interim surcharge (Rider IS).
  5. It multiplies the kWh by the rate of the mobile generation rider (December only).
  6. It multiplies the kWh by the energy charge of your plan, and adds the monthly charge of your plan if you type one. These are the charges of your retail electric provider.

The calculator rounds each line to the cent. Each percentage uses the rounded lines.

Items that the calculator does not include

  • The energy charge and other charges of your retail electric provider, except the two plan values that you type.
  • Plans with one all-in price that includes delivery. For those plans, the price on the Electricity Facts Label is the total.
  • Taxes, the PUC assessment and city fees that your provider adds.
  • Underground facilities charges (Rider UFCRF) and discretionary service charges.

Sources and last check

We read each value from the official documents below. The approval column shows the docket, order or advice number that is printed on each sheet. Last check: October 16, 2026.

DocumentUsed forEffectiveApproval
Residential Service (Sheet 1.1, Revision Eleven)Customer charge, metering charge, distribution system chargeJune 1, 2026Not printed on the sheet
Rider TCRF (Sheet 6.1, Revision Fifty-three)Transmission cost recovery factor (TCRF)October 4, 2026Not printed on the sheet
Rider DCRF (Sheet 6.4, Revision Twelve)Distribution cost recovery factor (DCRF)October 4, 2026Not printed on the sheet
Rider EECRF (Sheet 6.3, Revision Twenty)Energy efficiency cost recovery factor (EECRF)March 1, 2026Not printed on the sheet
Rider RCE (Sheet 6.5, Revision Six)Rate case expense surcharge (RCE)June 1, 2026Docket No. 58306 (printed on the sheet)
Rider IS (Sheet 6.7, Revision One)Interim surcharge (Rider IS)August 1, 2026Docket No. 58306 (printed on the sheet)
Rider MG (Sheet 6.6, Revision Two)Mobile generation rider (December only)December 1, 2025 factorNot printed on the sheet

Values read from the text of the Oncor Tariff for Retail Delivery Service, as linked from the Oncor tariffs and rate schedules page. Oncor is a delivery company: your retail electric provider bills these charges and adds the energy charge of your plan. The nuclear decommissioning charge is $0.000000 per kWh and is not shown. The interim surcharge (Rider IS) applies through December 2026. The mobile generation rider applies to December bills only. The TCRF, DCRF and EECRF history tables on the same sheets agree with the 2025 values in Oncor's earlier residential rate summary for retail providers. The PUCT residential delivery rate comparison page still shows September 2025 values, so it is not used as a check. The test bills are hand calculations. Oncor tariffs and rate schedules page.

Questions about Oncor bills

Why does Oncor not send me a bill?

Oncor delivers electricity in its area of Texas. Your retail electric provider sends the bill. The provider adds the Oncor delivery charges and the charges of your plan.

Where do I find the energy charge of my plan?

Look at the Electricity Facts Label (EFL) of your plan. It shows the energy charge in cents per kWh and any base charge. Type those values in the calculator.

Why is there a mobile generation charge in December?

The Oncor tariff applies the mobile generation rider in the December billing month only.

How often do the delivery charges change?

The TCRF changes about two times each year. The DCRF and EECRF change one or more times each year. The interim surcharge ends after December 2026. We check the values each month.

Why is my Oncor bill so high?

The most common reason is more kWh: heating and air conditioning use much electricity. Charges that change each month: mobile generation rider (December only). More days in the billing period also add kWh and daily charges. To see which reason applies to your bill, use the Why is my bill so high tool on this site: type your bill and an earlier bill, and it shows each reason in dollars.

Why is my bill different from the result?

Your bill can include sales tax, a city fee, a discount, a late fee or a different number of days. Type the number of days from your bill. To add tax, type the tax rate from your bill in the tax field. If your tariff has a discount program, select it in the options.

Where do I find my kWh?

Your bill shows the kWh for the billing period. Look for the meter reading section or the usage section.

What is the Oncor outage number?

To report a power outage to Oncor, call 888-313-4747, or use the outage map on the Oncor website. If you see a downed power line, stay away from it and call the utility or 911.

utilityratecalc.com is not part of Oncor Electric Delivery Company LLC or the Public Utility Commission of Texas. For the official values, use your bill and the tariff of Oncor.