Infrastructure Investment Program charge (Rider IIP) The tariff says that ACE adds this rate to the distribution rate on the bill. |
0.0442¢ per kWh |
All kWh |
BPU NJ No. 11 Electric Service, Section IV, Rider IIP, Fifth Revised Sheet No. 50 |
| Societal benefits charge (Rider SBC) |
0.9749¢ per kWh |
All kWh |
BPU NJ No. 11 Electric Service, Section IV, Rider SBC, Fifty-Sixth Revised Sheet No. 42 |
Securitization: transition bond charge and MTC-Tax (Rider SEC) Both securitization charges are $0.000000 per kWh at this time. |
0¢ per kWh |
All kWh |
BPU NJ No. 11 Electric Service, Section IV, Rider SEC, Twenty-Sixth Revised Sheet No. 40 |
Zero emission certificate recovery charge (Rider ZEC) The ZEC charge is $0 and the ZEC reconciliation charge is a credit at this time. |
−0.4265¢ per kWh |
All kWh |
BPU NJ No. 11 Electric Service, Section IV, Rider ZEC, Thirty-Third Revised Sheet No. 41 |
| Energy efficiency and clean energy charge (Rider EECEC) |
1.051¢ per kWh |
All kWh |
BPU NJ No. 11 Electric Service, Section IV, Rider EECEC, Thirty-Second Revised Sheet No. 48 |
| Conservation incentive program recovery charge (Rider CIP) |
0.1819¢ per kWh |
All kWh |
BPU NJ No. 11 Electric Service, Section IV, Rider CIP, Seventh Revised Sheet No. 51 |
BGS energy charge (Rider BGS-RSCP) Energy, generation capacity, ancillary services and administrative charges. Default service only. If you buy electricity from a supplier, the calculator uses the supplier price in place of this charge. |
Summer, First 750 kWh: 13.0325¢ per kWh Summer, Over 750 kWh: 14.03¢ per kWh Winter, All kWh: 14.0672¢ per kWh |
All kWh |
BPU NJ No. 11 Electric Service, Section IV, Rider BGS, Thirty-Third Revised Sheet No. 43 |
BGS reconciliation charge $0.000000 per kWh from September 1, 2026. ACE changes this charge on March 1, June 1, September 1 and December 1. Default service only. If you buy electricity from a supplier, the calculator uses the supplier price in place of this charge. |
0¢ per kWh |
All kWh |
BPU NJ No. 11 Electric Service, Section IV, Rider BGS, Fifty-First Revised Sheet No. 43a |
Transmission service charge The transmission rate of Rate Schedule RS plus the TEC of Rider BGS. A customer with a third-party supplier does not pay these charges. Default service only. If you buy electricity from a supplier, the calculator uses the supplier price in place of this charge. |
4.0862¢ per kWh |
All kWh |
BPU NJ No. 11 Electric Service, Section IV, Rate Schedule RS, Sheet No. 5, and Rider BGS, Sixth Revised Sheet No. 43c |